Excavations and underground services: CSCS test practice

Collapse of excavations, edge protection, and finding buried cables and pipes before digging.

8 questions, all reviewed by a qualified trainer

Practise excavations and underground services

One question at a time. You see the right answer and why straight after each one. No sign-up needed.

Revise my mistakes

Questions you get wrong are saved in this browser so you can come back to them.

About these questions. They are written by WorkSector from public sources, such as official guidance, the law and published course specifications, to help you revise. They are not questions from the real CITB Health, Safety and Environment test for Operatives, and WorkSector is not associated with, or endorsed by, the organisations that set or run it.

Example questions

  1. 1. You are due to work in a supported trench this morning. When must a competent person have inspected it before work starts?

    • AOnce a week, on Monday mornings
    • BOnly when the trench was first dug
    • CAt the start of each shift
    • DOnly if it has rained overnight
    Show the answer

    C: At the start of each shift. A competent person must inspect the supports or battering at the start of every shift, and again after any event that may have affected stability, such as a fall of earth. No work should start until the excavation is safe. An inspection when the trench was first dug is not enough, because ground conditions change from day to day.

    Source: Excavations, HSE

  2. 2. A digger is filling a dumper with spoil next to an open trench. Where should the spoil heap be kept?

    • ABack from the edge of the trench
    • BRight on the edge, so it is easy to backfill
    • CInside the trench, at one end
    • DAnywhere, as long as it is covered
    Show the answer

    A: Back from the edge of the trench. HSE warns that loose materials may fall from spoil heaps into the excavation and hit people working below, so keep spoil back from the edge. Edge protection such as toeboards should guard against falling materials, and head protection should be worn. Piling spoil right on the edge to make backfilling easier increases this risk.

    Source: Excavations, HSE

  3. 3. A delivery driver wants to park his lorry right beside the edge of a deep excavation to unload. Why should this not happen?

    • AIt will block the view of the site manager
    • BThe lorry may get dirty from the spoil
    • CIt is only a problem if the excavation is unsupported
    • DThe extra load near the sides increases the risk of collapse
    Show the answer

    D: The extra load near the sides increases the risk of collapse. HSE says do not park plant and vehicles close to the sides of excavations, because the extra loadings can make the sides more likely to collapse. The guidance makes no exception for supported excavations, so it applies to them too.